BMC Logo

BMC METAL INDUSTRIES SDN BHD
Malaysia Metal Door and Window frame manufacturer

4 Simple & Easy steps for frame installation

BMC frames are simple and easy to install. BMC staff can conduct on-site training of semi-skilled workers to give them installation competence.

The following 4 steps are :-


Installation Step 1

STEP 1
Mark out position of door as shown on plan. Position frame correctly making sure door opens as shown on drawing.

Installation Step 2

STEP 2
Using magnetic level, make sure frame is vertically and horizontally plumbed and leveled.

Installation Step 3

STEP 3
Drive concrete nails to bottom moulding brackets in holes provided, making sure frame is firm. Cut 2 pieces of timber to size and force the timber between the ceiling concrete and the side of the frame near corner tags, make sure it is firm and does not move, if near a column, a side support can also be used to add stability.

Installation Step 4

STEP 4
Position bricks to inside of frame making sure frame cavity is full of cement mortar. Install brick ties provided equally spaced.

Adaptor Brackets will be provided upon request for frames that are fixed to concrete columns.




Installation Step 5

Door frame section (no lintel required)

Installation Step 6

Section through jamb showing brick ties installation

    Call us for a no obligation FREE QUOTE today!

  • BMC Metal Industries

Malaysia's Architecture Construction & Design Directory

The best source of information for Architects, Builders, Contractors and Designers in Malaysia